![]() ![]() Responses should be provided by post or email by 10 September 2008, addressed to: Nick Carter Director General Regulation and Supervision Bureau PO Box 32800 Abu Dhabi Email: Īmendment No.1 The Bureau wishes to consult all interested parties on the proposed amendment, following which a revision of the Electricity Wiring Regulations will be issued. Two items of particular note concern the arrangements for RCD protection in Final Distribution Boards (clause 7.8.6) and the method for calculating Diversified Load (clause 3.2.5). This amendment contains a number of clarifications and additional guidance. Following implementation of these Regulation during 2008 the Bureau now proposes to issue an amendment to the Regulations, as a result feedback from interested parties. 1 Consultation, August 2008įoreword The Regulation and Supervision Bureau for the water, wastewater and electricity sector in the Emirate of Abu Dhabi (the Bureau) issued new Wiring Regulations in December 2007, covering the design, installation and maintenance of electrical installations in premises. 3Īttachment: The Electricity Wiring Regulations (2007) - Amendment No. ![]() Title: The Electricity Wiring Regulations (2007) - Amendment No. The Electricity Wiring Regulations (2007) - Amendment No. The Electricity Wiring Regulations (2007) - Amendment No.1 Consultation Regulation & Supervision Bureau Water and Electricity Sector Emirate of Abu Dhabi ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |